Site build
How to build a garden RC construction site
A step-by-step plan for a raised sand bed your machines can work in: size, materials, drainage and layout.
24 November 2026 · 7 minute read
A dedicated site turns a machine you play with now and then into a hobby you go back to every weekend. It also keeps sand out of the lawn. This is the plan we would follow for 1:14 machines.
1. Choose the spot
Pick level ground near a power socket for charging, with some shade so sand does not get too hot for the electronics. Avoid tree roots and soft lawn.
2. Size it for your machines
For one 1:14 excavator and a tipper, 2 m by 3 m is a good minimum. Every extra machine wants another metre so they can pass each other.
3. Build a raised frame
Use pressure-treated sleepers or 150 mm decking boards screwed to corner posts. A frame two boards high holds enough depth to dig and stops sand spreading.
4. Sort the drainage
Lay a weed membrane on the ground, then 50 mm of gravel, then a second membrane. Rain drains away and the sand dries quickly after a shower.
5. Choose the fill
Washed sharp sand holds a shape when damp and digs cleanly. Play sand is softer and better for electric machines. Many builders use sharp sand in the dig area and keep a bay of gravel for loading.
6. Lay out the site
Leave a level haul road around the edge for tippers, a dig pit in the middle, and a stockpile bay in one corner. A short ramp made from a board covered in sand lets machines climb on and off a low-loader.
7. Cover it
A fitted cover or tarpaulin keeps leaves, rain and cats out between sessions.